SCADA
System
e.
Deisel
Engine
Generators.
f-
ATSs.
g-
Battery
Banks-
h.
Meters.
i.
Associated
equipment.
2-
The
system shall be
capable
of
displaying
each
Pumping
Plant
on
a
dedicated monitor
such
that
all
pumping
plants
can
be
monitored
simultaneously.
3.
Each
work
site
screen
shall
be
navigable
from
the
main
overview
screen
via
point-and-click
functionality
built
in.
4.
Other
screen
types
shall
be
Control,
Communications
Status,
Alarm
Summary,
Runtime Manager,
Trends,
Reports,
SER, and
water
levels.
5.
Analog values
shall
be
displayed
in
U.S.
customary
units
and
shall
be
formatted
in
engineering
notation
for
numbers
greater
than
1000
and
numbers less
than
1.
6.
Status
points shall
be
displayed
as
ON/OFF
and
color
coded
as
approved.
G.
Reports:
Process
data
reports
shall
consist
of
minimum,
maximum,
and
average
values
on
an
hourly,
daily,
weekly,
and
monthly
basis
for
all
pertinent
analog
values
at
each
work
site.
The
following
shall
also
be
included:
1.
Reports
shall
include
a
Date
and
Time
Stamp.
2.
Load
Profiling
Reports shall
be
available
in
5,
10,
15,
30, and
60
minute
intervals
and
shall
be
configurable
on
screen.
a.
Shall
be
capable
of
choosing
the
quantities
to
report from
a
list
of
available
analog
quantities.
3.
Operating
Statistics
Reports
shall
be
available
in
6
hour
increments,
minimum.
Other
device
increments
available
shall also
be
included-
4.
Motor
Start
Reports
shall
be
available
as
a
Summary,
Start
Data,
or
both.
5-
Motor
Start
Trending
Reports
shall
be
available
in
30
day
intervals.
16760-18