SCADA
System
SECTION
16760
SCADA
SYSTEM
PART
1
GENERAL
1.01
DESCRIPTION
A.
This
section
covers
requirements
for
the
Supervisory
Control
and
Data
Acquisition
(SCADA)
System
for
the
Sutter
Bypass
-
Control
System
Rehabilitation
Project
which
includes
the
following
sites:
1.
Suffer
Maintenance
Yard
(SMY).
2.
Pumping
Plant
No.
1
(PP1).
3.
Pumping
Plant
No.
2
(PP2).
4.
Pumping
Plant
No.
3
(PP3).
B.
The
SCADA
System
shall
be
a
complete
integrated
system
with
the
Metal-Enclosed
Switchgear,
Relays,
Instrumentation,
Programmable
Logic
Controllers,
Diesel
Engine
Generators,
Automatic
Transfer
Switches,
Existing
Water
Level
Measurement
Equipment
and
Communications
System.
C.
The
contract
item
SCADA
System
includes
furnishing
and
installing
SCADA
System
Equipment
and
Software
at
the
Sutter
Maintenance
Yard,
PP1,
PP2,
and
PP3
to
include:
1.
SCADA
Workstation.
2.
Laptop
3.
SCADA
Server.
4.
Historical
Data
System
(HDS).
5.
SCADA
System
and
Software.
D.
The
Contractor
shall
assume
responsibility
for
the
provision
and
performance
of
the
complete
integrated
control
system.
The
SCADA
System
shall
be
a
Turnkey
Solution
that
meets
the
design
intent.
16760-1
L-09
Page view 0
1 2 3 4 5 6 ... 29 30

Summary of Contents

Page 1

SCADA SystemSECTION 16760SCADA SYSTEMPART 1 GENERAL1.01 DESCRIPTIONA. This section covers requirements for the Supervisory Control and DataAcquisition

Page 2

SCADA Systemc. Resistant to UV light, solvents, corrosion, fungus.d. Overmolded handle.e. Double Throw latches.f. Automatic Ambient Pressure Equalizat

Page 3

SCADA SystemC. The Laptop shall be DELL Precision Mobile, M4400 Series; Apple,MacBook Pro 17; or equal.D. Laptop computer shall include accessories, c

Page 4

SCADA Systemb. 10,000 RPM.c. Serial-Attached SCSI.d. 6Gbps.e. 3.5in Hotplug Hard Drive.5. RAID Controller with 512MB Cache and 6 Gb/s SAS interface.6.

Page 5

SCADA System2) RJ-45 10/100 Base-T.3) USB.LED status display with load and battery bar-graphs and OnLine, On Battery, Replace Battery, Overload and By

Page 6

SCADA System2.04 HISTORICAL DATA SYSTEM (HDS) SERVERA. The HDS Server shall control the creation, maintenance, and the use ofthe database of historica

Page 7

SCADA Systemd. Direct Attached Storage (DAS) shall be DELL, PowerVaultMD1000; or equal.8. Redundant Power Supply, High Output, 850W.9. Dual two port 1

Page 8

SCADA Systemcommunicate directly with the remote sites unless otherwise noted.The Contractor shall be responsible for the integration of the SCADA,Int

Page 9

SCADA SystemC. The software shall also be capable of performing the followingbackground tasks:1. Report generation.2. Data archiving.3. Historical Dat

Page 10

SCADA Systeme. Deisel Engine Generators.f- ATSs.g- Battery Banks-h. Meters.i. Associated equipment.2- The system shall be capable of displaying each

Page 11

SCADA System6. Event Reports shall be available in 15, 30, 60 and 120 or 15 and 64cycle intervals, depending on the NMFR. Prefault Intervals shall be1

Page 12

SCADA System1.02 RELATED SECTIONSA. Supplementary General Conditions, General Conditions, Division 1sections, and Drawings apply to this section. This

Page 13

SCADA SystemAlarms: SCADA alarming software shall be configured for notificationof field, communications, and system alarms.1. Provide high, low, equ

Page 14

SCADA SystemJ. System Database: Field data collected shall be stored to a HistoricalData Server (HDS) that resides on the Ethernet network. Thisarchit

Page 15

SCADA System7. The database application shall monitor the LAN and/or WANconnections between the actual SCADA Server and the HDS. Inthe event that the

Page 16

SCADA SystemL. The SCADA System Software is subject to approval.M. The SCADA Systems Integrator shall be TESCO Controls Inc.; EMCORServices -Fluidics;

Page 17

SCADA Systemb. A3.c. A4.d. A5.e. C5 Envelope.f. DL Envelope.g. Executive.h. Folio.i. JIS-B4.j. JIS-B5.k. Ledger.I. Legal.m. Letter.n. Statement.o. Uni

Page 18 - Associated

SCADA System19. Included Ports:a. Internal Card Slot.b. USB Direct interface on Operator Panel.c. Gigabit Ethernet (10/100/1 OOOBASE-T).d. Hi-Speed US

Page 19

SCADA SystemC. The Enterprise Network Printer shall be Lexmark, C935hdn; Hewlett-Packard, CP6015xh; or equal.2.07 ACCESSORIESA. Ethernet Cables:1. T

Page 20

SCADA SystemPART 3 EXECUTION3.01 INSTALLATION AND CONFIGURATIONA. General: The Contractor shall be responsible for field measurementsand surveys requi

Page 21

SCADA System2. Server software shall be loaded onto each server and configured,including licensing, for optimum SCADA System performance.3. The SCADA

Page 22

SCADA SystemG. Touchscreen HMI software shall be installed as required in accordancewith the software and equipment manufactaurer's recommendatio

Page 23 - Fluidics;

SCADA System9. Underwriters Laboratories Inc. (UL).1.04 SUBMITTALSA. The Contractor shall submit the following:1. Catalog cuts sheets.2. System Softwa

Page 24

SCADA SystemD. The Contractor shall originate and develop a test plan for the followingtests:1. Shop Tests.2. Commissioning Tests.3. Site Acceptance T

Page 25

SCADA System10. Test reports:a. Commissioning Tests.b. Site Acceptance Tests.1.05 SPARE PARTS AND TOOLSA. The Contractor shall furnish one spare fully

Page 26

SCADA SystemE. Each pumping plant shall have a local Human Machine Interface (HMI)which shows data and alarms for the associated pumping plant.Informa

Page 27

SCADA SystemPART 2 PRODUCTS2.01 SCADA WORKSTATIONA. The SCADA Workstation shall be the main View Node used formonitoring and control of the pumping pl

Page 28

SCADA System12. Monitor Mount including the following:a. Dual Tiered, two over two.b. Wall Mount, Grommet Mount, Flush Mount as approved.c. Up to 30 i

Page 29

SCADA Systemg. Tower Mount.h. Interface Ports:1) RS-232.2) RJ-45 10/100 Base-T.3) USB.i. LED status display with load and battery bar-graphs and OnLin

Page 30

SCADA System2.02 LAPTOP COMPUTERA. The SCADA System shall include a Laptop computer which shall beused for bidirectional communication with the PLCs,